OEE Case Study: How a 12-Machine Job Shop Reclaimed 38 Points in 90 Days
A real-world bottleneck reduction study from a contract machining shop. Walk through the data, the theory of constraints decisions, and the digital handoff changes that lifted OEE from 41% to 79%.